找轴承就上,中国轴承网(中轴网)

| 加入桌面 | 手机版 | 二维码 | 无图版
我要采购
发布信息当前位置: 首页 » 供应 » 调心球轴承 »

Cast iron ground rack

  • 新型号:
  • 旧型号:
  • 所属类型:调心球轴承
  • 品牌:北重
  • 价格:面议
  • 起订量:1 件
  • 数量:10 件
  • 发布时间:2016-05-10
  • 所 在 地:河北-沧州市
询价
联系方式
公司基本资料信息
 
 
产品详细说明 公司档案
Cast iron ground rack参数规格
  • 新型号
  • 旧型号
  • 内径
  • 外径
  • 宽度
  • 重量
  • 品牌
  • 北重
  • 类型
  • 调心球轴承

泊头市北重机械制造有限公司专业销售的Cast iron ground rack,针对Cast iron ground rack客户提供相关咨询服务,需要了解Cast iron ground rack尺寸、重量、价格、安装、维护等资料请与我们联系。


泊头北重出售地轨,加宽地轨,T型槽地轨,铸铁地轨。
Cast iron ground rails application:According to the fixed point of equipment to design,    join together into ground rails, do not make a large platform,which saves the cost of materials, and can take up small space, high performance to price ratio.Cast iron ground rail is mainly used for large equipment assembly, test, welding and inspection. We can make or agreed production and processing according to buyer's drawings specifications of ground rail.
铸铁地轨的材质:高强度铸铁HT200-300,工作面硬度为HB170-240,经过人工回火处理,使该产品的精度稳定,耐磨性能好。
 Cast iron ground rail materials:High strength cast iron HT200-300 working surface        hardness is HB170-240, through artificial tempering processing, make the precision of    the product stability, and wear-resisting performance is good.
铸铁地轨铺设的技术要求
1、铸铁地轨的固定方法,在轨道的内侧两边,按要求间距(约500-700mm)用M8铁膨胀钉或射钉固定牢靠。轨道底面与地面必须紧密着力,不得有虚跨间隙,以防止地轨轨道载荷后弯曲变形。
  2、地轨的的安装:使用条形桥板,合像水平仪。先调平一根地轨,然后以其为基准,依次往下进行初调。然后水泥灌浆,待水泥浆凝固后,进行精调检验。
  3、铸铁地轨的埋设深度应与地面装饰层持平或略高于3-5mm.
  4、地轨安装后,要任意1m长度内,水平偏差度不大于1mm,全长不大于2mm,轨道这间对应点的水平偏差不大于1mm,每两条轨道之间的平行度偏差小于2mm。
  直线度在全长内不大于8mm
Cast iron ground rail laying technical requirements
Firstly: cast iron ground rail fixed method ,in on both sides of the inside of the orbit, spacing    (about 500-700 - mm) as required with the M8 bolts or nail fixation.Orbital floor and must closely focus on the ground,in order to prevent the ground rail track bending deformation after loading.
Secondly, ground rail installation:use bridge plate ,combined diagram level.Firstly trying to adjust   to rail, then as a benchmark, in order to under initial setting.Then cement grouting, after waiting for cement solidification, fine adjustment inspection.
Thirdly,To the buried depth of the rail shall be cast iron and the ground adornment layer flat or slightly higher than 3-5 mm.
Forthly,After the installation of ground rail,to any 1 m in length,horizontal deviation degree is not greater than 1 mm,length is not greater than 2 mm, track the level of the corresponding point deviation is not greater than 1 mm, per the parallelism between the two     track deviation is less than 2 mm.

0条 [查看全部]  相关评论
 
更多..本企业其它产品

[ 供应搜索 ]  [ 加入收藏 ]  [ 告诉好友 ]  [ 打印本文 ]  [ 关闭窗口 ]

网站首页 | 关于我们 | 联系方式 | 使用协议 | 版权隐私 | 网站地图 | 网站留言 | 广告服务 | 鲁ICP备17032008号-1

本站关键词:中轴网|轴承网|中国轴承网|轴承厂家|进口轴承|轴承型号|轴承型号查询 

有事点这里-找轴承网客服部:技术支持|有事点这里-找轴承网客服部:投诉与建议|进口轴承交流群:207818513|瓦房店轴承交流总群:9041483|山东轴承交流群:222900836
免责声明:中国轴承网所展示的信息由企业自行提供,内容的真实性、准确性和合法性由发布企业负责。中国轴承网对此不承担任何误证责任。

安全联盟 鲁ICP备17032008号-1
 
站内信(0)     新对话(0)